Scheduling
Available Event Types in scheduling.
Command
Select a Command to be executed by the Player at a specific point in time
Overlay Layout
Layouts that have been designed as an Overl ay Layout will be scheduled at the same time as existing Layouts to create an overlay of content when displayed.
Interrupt Layout
An Interrupt Layout will schedule a selected Layout to play in-between other Layouts in the 'usual schedule'.
Xibo will work out when it will be played using how many seconds per hour or as a Percentage entered on the schedule.
Select Interrupt Layout as the Event Type from the drop down menu when adding an Event.
Complete the form fields to create the schedule.
Share of Voice
Enter the amount of time the Layout should be shown in seconds per hour or as a percentage (0 - 100%) of the events duration (the difference between the from date and the to date) that the Interrupt Layout should occupy the usual schedule.
Action
Scheduled Actions listen for a Trigger Code coming in on a webhook to Navigate to a Layout or to run a Command.
Navigate to Layout - enter the code identifier for the Layout the Player should navigate to when triggered. This code is created when adding a new Layout or from editing an existing from the Layouts grid.
Command - select the Command to run.
Synchronised Events
Synchronised Events are used in conjunction with Sync Groups to show mirrored or a video wall configuration across 2 or more Displays.
Click on the Add Synchronised Event button at the top of the schedule grid to open the Add Synchronised Event form.
Select a Sync Group from the drop down menu.
Use the Layout drop down to select which content should be shown on each Display within the group.
When selecting different content to show in a wall configuration on Displays, the total duration will be enforced by the content on the Lead Display.
Select Mirror to automatically set the same item on each Display within the group automatically.
Dayparts
Events are scheduled using Dayparting information:
Select Custom to enter your own start and end times. Use the Relative time checkbox to input the Hours and Minutes when creating a Scheduled Event (not available for Synchronised Events).
Select Always to have the content always scheduled on the selected Display.
Use the drop down to select what needs to be scheduled from the list.
Last updated
Was this helpful?

